Elizabeth Line, Installation of Flood Defences at North Woolwich Portal and Plumstead Portal

Transport for LondonLondonworksbelow threshold
Your saved contracts

What the buyer wrote

Construction of manually deployed active flood defences at North Woolwich Portal and Plumstead Portal, which have previously been designed by a third party. Construction and installation of the defences required to mitigate against the foreseeable flooding risks involve the following civil engineering works: - Construction of in-situ, reinforced concrete walls - Installation of the Embedded Rail System, and precast units - Stop-log mounting items.

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

SpoorTech Ltd£520kends (14 Aug 2026)

Details

What the buyer calls it
Elizabeth Line, Installation of Flood Defences at North Woolwich Portal and Plumstead Portal
How they are buying
Called off an existing agreementThe work went to a supplier already on a framework or dynamic market.
Type
works
Work starts
17 Aug 2025
Work ends
14 Aug 2026
Where
in London

Who the buyer named

Molly Beaumont was the named contact on this notice.