Skip to the main content
The Crier

North Acton to Hanger Lane Cutting Remedial Work

Transport for LondonLondonworksabove threshold
Your saved contracts

What the buyer wrote

Transport for London (TfL) has identified that cuttings CTS 7 and CTS 8 between North Acton and Hanger Lane require remedial works to stabilise the cutting. The combined length of the cuttings is approximately 1100m. The assets are susceptible to pore pressure levels (the pressure of groundwater in the soil or rock) and displacements and are considered a high risk. Due to the increased number of prolonged rainfall events over the recent years, soil pore pressure build up has become more common and the asset is at greater risk of failure. In 2017, TfL Engineering produced a detailed design for remediating the asset which consisted of; Discrete Bored Piles Discrete H-Piles King Post Wall Asset…

Read all of it on Find a Tender →

Details

What the buyer calls it
North Acton to Hanger Lane Cutting Remedial Work
How they are buying
Advertised, then negotiatedThe buyer talked terms with bidders rather than taking fixed offers.
Type
works
Where
in London

Who the buyer named

Forhan Miah was the named contact on this notice.

ForhanMiah@tfl.gov.uk