Skip to the main content
The Crier

Verification of Critical Ventilation Systems

Your saved contracts

What the buyer wrote

The Trust currently has a requirement for To provide verification services on Critical Ventilation Systems within the Trust in accordance with HTM 03-01 Part B Appendix 1 Annual Inspection of Critical Ventilation Systems – AHU and Plantroom Equipment, and Appendix 2 Operating Suite Annual Verification, and the requirements specified in this document.<br/><br/>The specific areas of work are: - <br/> 1) Operating Theatres <br/> 2) Bone Marrow Treatment Rooms (BMT) <br/> 3) Positive Pressure Ventilated Lobby Rooms (PPVL)

Details

What the buyer calls it
Verification of Critical Ventilation Systems
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
services
Where
in London

Who the buyer named

Jacob Partridge was the named contact on this notice.

jacob.partridge@gosh.nhs.uk