Elizabeth line, Canary Wharf Bostwick Gates Replacement
What the buyer wrote
Transport for London (TfL) is commencing a procurement process to appoint a supplier to deliver the requirements of Design and Build Elizabeth line, Canary Wharf Bostwick Gates Replacement. The works are described in the procurement documents and cover the following main activities: - removal of the three (3) faulty gates for the Northwest, Southeast and Southwest main entrances - develop the design to replace Northwest, Southeast and Southwest main entrances gates with similar, manually operated, traditional Bostwick SR2 style gates. - construction and installation of the new Northwest, Southeast and Southwest main entrances gates. The Railway Industry Supplier Qualification Scheme (RIS…
Details
- What the buyer calls it
- Elizabeth line, Canary Wharf Bostwick Gates Replacement
- How they are buying
- Called off an existing agreementThe work went to a supplier already on a framework or dynamic market.
- Type
- works
- Where
- in London
- Kind of work
- New build construction
Who the buyer named
Molly Beaumont was the named contact on this notice. Questions closed on 5 Aug 2025, 23:59 BST.
