Skip to the main content
The Crier

Jubilee Vehicle Underframe Modification (JVUM) Lot 2 Drawgear modification - concept- design - prototype

Transport for LondonLondonservicesabove threshold
Your saved contracts

What the buyer wrote

The scope of the Specification includes the design, prototyping and testing of the Modified Drawgear at all intermediate positions on the 1996 Tube Stock (96TS) vehicles. The scope requirements for the design, prototyping and testing of a Modified Drawgear for the London Underground (LU) 1996 Tube Stock (96TS) are to address the known deficiencies of the existing system. This project is known as Jubilee Vehicle Underframe Modification (JVUM) Project Lot 2. The Designer is required to design, supply and test prototypes for the Modified Drawgear at the intermediate vehicle positions of the 96TS. The Modified Drawgear shall feature a Collapse Element to replace the failing Jaw Release Mechanis…

Read all of it on Find a Tender →

Details

What the buyer calls it
Jubilee Vehicle Underframe Modification (JVUM) Lot 2 Drawgear modification - concept- design - prototype
How they are buying
Advertised, then negotiatedThe buyer talked terms with bidders rather than taking fixed offers.
Type
services
Where
in London, in the North East, in the North West, in Yorkshire and The Humber, in the East Midlands, in the West Midlands, in the East of England, in the South East, in the South West

Who the buyer named

Molly Beaumont was the named contact on this notice. Questions closed on 29 Aug 2025, 15:00 BST.

MollyBeaumont@tfl.gov.uk