Supply of Cab HVAC Overhaul Services for the 09TS Victoria Line Fleet
What the buyer wrote
Supply of Cab HVAC Overhaul Services for the 09TS Victoria Line Fleet - There are 47 trains with 8 cars on the Victoria line (09TS). Each train has two cabs, one at each end. Each 09TS cab has two HVAC modules installed on the underframe on the left and right-hand side (non-driver's side and driver's side respectively, The purpose of the cab HVAC modules is to supply fresh air to the cab and maintain the thermal comfort of those in the cab, principally the train operator.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Supply of Cab HVAC Overhaul Services for the 09TS Victoria Line Fleet
- How they are buying
- Advertised, then negotiatedThe buyer talked terms with bidders rather than taking fixed offers.
- Type
- goods
- Where
- in London
- Kind of work
- Transport and fleet, Heating, plumbing and mechanical
Who the buyer named
Molly Beaumont was the named contact on this notice.
